Santa Monica, CA

Temporary Power Pole in Santa Monica, CA

A temporary power pole is a metal or wood pole rigged with a meter socket and breaker panel that gives a construction site electricity before permanent service goes in. Most jobs run a 200 amp temporary power pole. Santa Monica Porta Pros coordinates delivery and placement so your electrician can tie in fast and your construction site services stay on schedule.

  • Our own trucks and crews
  • Weekly servicing included
  • Local dispatch

What Is a Temporary Power Pole Used For?

A temporary power pole feeds tools, lighting and trailers on a job site before the building has permanent power. Contractors pair it with a light tower rental for night work and with a mobile office trailer rental that needs an outlet for a space heater or a computer. Santa Monica builders often run one pole for the whole site during framing, then keep it up through drywall and finish work. GFCI protection matters here: OSHA 1926.404(b)(1)(ii) requires ground fault circuit interrupter protection on construction sites, and your electrician will wire the panel to meet it. Pair the pole setup with a handwashing station rental near the trailer entrance and a temporary fence rental around the equipment yard, since a live panel next to open foot traffic is a liability nobody wants. If the crew is also doing sitework, a 10 yard dumpster rental for debris keeps the area clear under OSHA 1926.25 housekeeping rules.

How Much Does Temporary Power Pole Installation Cost?

Installation cost depends on amperage, trench length and how far the pole sits from the utility connection point, and every site in Santa Monica gets a site-specific quote. What we can quote directly is the site work around it: delivery of support equipment like fencing and toilets follows the bands below.

itemdurationtypical price
delivery feeday$150
delivery feeweek$100
fence rentalday$50
standard toiletweek$200

Request a request a quote for the pole itself, since the electrical contractor prices the panel, meter loop and trenching separately from Santa Monica Porta Pros' site services.

Where Should a Temporary Power Pole Be Placed on Site?

Placement follows the same logic as a porta potty placement guide: clear of vehicle paths, close to the load, and easy for the utility company to read the meter. A temporary power pole diagram usually shows the pole set 10 feet from the property line with a straight run to the panel location, though your electrician confirms exact clearances for Santa Monica. Keep at least 36 inches of clear route around the pole base per ADA Standards 403.5.1 if the path also serves an accessible unit like the ADA accessible porta potty. Illumination matters too: OSHA 1926.56(a) sets minimum lighting intensities for construction areas, so a pole feeding a light tower after dark isn't optional, it's compliance. Coordinate the pole location with your storage container rental and roll-off dumpster rental placement so delivery trucks aren't backing over buried cable, and remember a roll-off delivery needs about 60 feet of straight clearance behind the truck.

How long does temporary power pole installation take?

Timing depends on the utility company's meter release and inspection schedule, not on the pole itself, which typically goes up in under a day. Coordinate early. If your job also needs a porta john rental or fencing, schedule those at the same time so the site is ready together.

Do I need a permit for a temporary power pole in Santa Monica?

Likely yes, but permit rules vary and need confirming with the city directly; we haven't verified specific ordinance numbers. Check with the building department before your electrician schedules the meter release. See dumpster permit requirements for how a similar site permit process typically runs.

What amperage do most construction sites need?

Most residential remodels and small commercial jobs run a 200 amp temporary power pole. Larger sites with tower cranes or multiple trailers may need higher amperage. Your electrician sizes the service to your load, not to a generic rule.

Can Santa Monica Porta Pros handle the whole site setup?

Yes. We deliver toilets, fencing, dumpsters and storage alongside your power pole install, coordinating drop-off so nothing blocks the electrician's trench or the utility company's access. See construction site services for the full list.

How far will you travel for a job outside Santa Monica?

We serve jobs in Culver City, about 7.5 miles east, and Beverly Hills, about 9.1 miles northeast, along with sites further out. Check service areas for the full coverage map.

On the job with our local crew

Next step

Get a delivery date

Tell us the address, the dates and the headcount. We size the order and confirm the route.